Update
on renovation project
· The removal of library
books to an alternative location has been completed.
·
Demolition
will start in the first week of July and will take around 10
weeks
A
reminder that services have continued since the closure on 8th
May:
·
Electronic
Resources: full access to all digital materials via our
catalogue, both on and off campus.
·
Print
Collection: all titles will be available for request through
our catalogue - more information to follow.
·
Diploma
Students’ Reference Collection: in Room 131 (next to the
library entrance) and available for short-term loan.
· Book Returns: to Room
131.
During
the renovation period, the following alternative learning
spaces are available at the Galileo Guest House:
·
Entrance level
Reading Rooms A, B and C
• First floor: Reading
rooms 103 and 104 (rooms equipped with PCs reserved for
Diploma course)
• Second floor Reading Rooms 203, 204, 205 and 206 (rooms
equipped with PCs reserved for Diploma course)
The
opening of the renovated library is planned in spring 2026.
The
e-book collection of the Institute of Physics (IOP) is
temporarily unavailable. We are working on restoring this as
soon as possible.
Security
As
part of the security measures implementations
Following
repeated incidents of multiple persons entering the building
through the LB terrace without badging, please remember that
all visitors must either have a security badge or be signed
in by security at the LB main entrance.
Greening
ICTP
As
part of our ongoing commitment to the UN SDGs, ICTP’s new
waste collection system has been implemented at the Leonardo
Building. The system aims to reduce the use of plastic bags
and increasing recycling efficiency across our facilities.
Key
changes at the Leonardo Building include:
This
initiative is designed to foster a cleaner, greener
workplace and to support our collective effort toward a more
sustainable future.
Student
Accommodation
ICTP
contracts around 50 rooms at a Campus X, a private student
housing in Trieste. The water supply at Campus X had been
suspended from mid-June, mainly affecting our Diploma
students. Campus X are working to resolve the situation and
in the meantime alternative arrangements have been made for
sanitary facilities, meals and cooking facilities both at
Campus X and at ICTP premises. All efforts are being made
to resolve matters as quickly as possible and to provide
timely information to those affected.